AWMA

AWMA Water Control Solutions - Design, Manufacture, Install

+ 61 3 5456 3331
  • Home
  • About AWMA
    • The AWMA Team
    • Awards & Accolades
    • Services
      • Design Services
      • Manufacturing Capabilities
      • Install
      • FlowLab Testing Facility
    • Careers
    • Testimonials
  • Applications
    • Flood Mitigation
    • Environmental
    • Irrigation Modernisation
    • Urban Water
    • Dams
    • Energy & Resources
    • Fish Protection Screens
    • Industrial Intake Screens
  • Products
    • Penstocks & Gates
      • TLF Penstocks
      • SLF Penstocks
      • ULF Penstocks
      • DLF Penstocks
      • Decant Gates
      • WLF Penstocks
      • LayFlat Gates
      • Sidewinders
      • Multi-leaf Gates
      • Bulkheads
      • Round Bottom Bulkheads
      • Modular Stoplogs
      • Stopboards
      • Radial Gates
      • Flap Gates
      • Specialised Gates
    • Actuation Systems
    • Flood Gates and Barriers
      • Flood Gates
      • TILTING BARRIERS
      • RETRACTABLE BARRIERS
      • CONCEALED BARRIER
      • Demountable Barriers
      • SWING BARRIER
      • FLOOD DOORS
    • Screens – Self Cleaning
      • CYLINDER SCREENS – POWERED
      • Cylinder Screens – Self-Propelled
      • Travelling Polymer Screens
      • Cone Screens
      • Flat Panel Screens
      • Trash Screens & Trash Racks
    • Fish Protection Screens
    • Worthington Booms
  • Projects
    • All
    • Flood Mitigation Projects
    • Environmental Projects
    • Irrigation Projects
    • Urban Water Projects
    • Dam Projects
    • Energy and Resources Projects
    • Screen Projects
  • Gallery
    • AWMA
    • Flood
    • Environmental
    • Irrigation
    • Urban Water
    • Dams
    • Energy and Resources
    • Screens
    • Video
  • Media
    • News
    • Downloads
  • Contact
    • Australia
    • New Zealand

The Melbourne Main Sewer Replacement Project

June 16, 2016 by

Print Friendly, PDF & Email

John Holland Tunnelling engaged AWMA to assist with Melbourne Water’s high profile, Melbourne Main Sewer Replacement Project. Melbourne Water’s largest WLF penstock will be used to isolate the 1.8m diameter Melbourne Main Sewer.

AWMA were engaged to design, manufacture, install and test the 4m high structure. Despite the challenging site location and environment (14m below a Melbourne city freeway), the gate was tested in-situ under 10.9m head pressure with excellent results.

The 7.5m spindle leads up into an enclosed actuator pit. The gasless pit houses the headstock and actuator used to drive the gate. Melbourne Water have three control options for the isolation gate including manual operation from within the actuator pit, local control from street level above the pit and remotely via Melbourne Water’s SCADA system.

The infrastructure for these projects required significant engineering. AWMA supplied flow control gates, actuation systems and storage structures including a Round Bottom Penstock custom designed to seal against the benched sewer profile.   AWMA’s unique capacity to achieve innovative designs using grade 2507 stainless steel resulted in custom manufactured products that exceeded all requirements.

Melbourne Water is replacing a section of the existing Melbourne Main Sewer. The new main sewer will travel approximately 2.3km from Docklands, crossing the Yarra River upstream of the Charles Grimes Bridge, and into Port Melbourne.   The Melbourne Main Sewer Replacement Project is an important project that will deliver health and environmental benefits to meet the future growth of Melbourne.

OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
tn_wlf_cut

For more information

Client: John Holland Tunnelling
Asset Owner: Melbourne Water
Value: $220 Million

  • The Melbourne Main Sewer Replacement Project

Filed Under: Environmental, Urban Water

Phone: + 61 3 5456 3331

Email: info@nullawmawatercontrol.com.au

Facebook
Twitter
YouTube
LINKEDIN

Related ArticlesPrivacy Policy

AWMA Logo AWMA Quality Awards
QUALITYLOGOS

Phone: +61 3 5456 3331
Email: info@awmawatercontrol.com.au

FACEBOOK
YOUTUBE
LINKEDIN

Related ArticlesPrivacy Policy

awma-footer-logo