CCB Envico has completed an upgrade of the Echuca Water Treatment Plant, including a demountable flood gate required to protect the plant from water ingress. The flood gate consists of two sections, each 5000mm wide x 1000mm high.
Permanently stored on-site, the flood gate segments include lifting points for ease of transport and placement into the side frames by on-site operators.
The upgrades aim to ensure Echuca’s water security, allowing for growth, and protecting the township’s water supply.