AWMA

AWMA Water Control Solutions - Design, Manufacture, Install

+ 61 3 5456 3331
  • Home
  • About AWMA
    • The AWMA Team
    • Awards & Accolades
    • Services
      • Design Services
      • Manufacturing Capabilities
      • Install
      • FlowLab Testing Facility
    • Careers
    • Testimonials
  • Applications
    • Flood Mitigation
    • Environmental
    • Irrigation Modernisation
    • Urban Water
    • Dams
    • Energy & Resources
    • Fish Protection Screens
    • Industrial Intake Screens
  • Products
    • Penstocks & Gates
      • TLF Penstocks
      • SLF Penstocks
      • ULF Penstocks
      • DLF Penstocks
      • Decant Gates
      • WLF Penstocks
      • LayFlat Gates
      • Sidewinders
      • Multi-leaf Gates
      • Bulkheads
      • Round Bottom Bulkheads
      • Modular Stoplogs
      • Stopboards
      • Radial Gates
      • Flap Gates
      • Specialised Gates
    • Actuation Systems
    • Flood Gates and Barriers
      • Flood Gates
      • TILTING BARRIERS
      • RETRACTABLE BARRIERS
      • CONCEALED BARRIER
      • Demountable Barriers
      • SWING BARRIER
      • FLOOD DOORS
    • Screens – Self Cleaning
      • CYLINDER SCREENS – POWERED
      • Cylinder Screens – Self-Propelled
      • Travelling Polymer Screens
      • Cone Screens
      • Flat Panel Screens
      • Trash Screens & Trash Racks
    • Fish Protection Screens
    • Worthington Booms
  • Projects
    • All
    • Flood Mitigation Projects
    • Environmental Projects
    • Irrigation Projects
    • Urban Water Projects
    • Dam Projects
    • Energy and Resources Projects
    • Screen Projects
  • Gallery
    • AWMA
    • Flood
    • Environmental
    • Irrigation
    • Urban Water
    • Dams
    • Energy and Resources
    • Screens
    • Video
  • Media
    • News
    • Downloads
  • Contact
    • Australia
    • New Zealand

Goulburn-Murray Water’s Cohuna Weir

June 16, 2016 by

Print Friendly, PDF & Email

The original Cohuna Weir was constructed in 1908-1910 with eight bays built from local redgum timber. In 2006, Goulburn-Murray Water (G-MW) engaged AWMA to design, manufacture and install the flow control gates, control systems, electrical works and access platforms required for the reconstruction of the Cohuna Weir and Offtake.

The three AWMA Head & Discharge Gates designed for this project were 2m x 2.15m and manage the same water flow of 900ML (maximum 1500ML) per day. The Head & Discharge Gate is effectively two gates in one. The upper section of the gate can be lowered allowing water to flow over the top of the gate during normal operation, or the lower section raised during periods of high water use allowing water to be released under the gates. The Cohuna Weir control gates are automated using AWMA HVA 24VDC actuators, remotely controlled from G-MW offices via radio link communications.

The new Cohuna Weir Offtake consists of three Hollow Section UnderShot Gates with AWMA HVM (manual) actuators and access platforms for pedestrians and GMW operators.

For more information

Client: Goulburn-Murray Water
Asset Owner: Goulburn-Murray Water, VIC

  • Goulburn-Murray Water (G-MW), VIC

Filed Under: Irrigation

Phone: + 61 3 5456 3331

Email: info@nullawmawatercontrol.com.au

Facebook
Twitter
YouTube
LINKEDIN

Related ArticlesPrivacy Policy

AWMA Logo AWMA Quality Awards
QUALITYLOGOS

Phone: +61 3 5456 3331
Email: info@awmawatercontrol.com.au

FACEBOOK
YOUTUBE
LINKEDIN

Related ArticlesPrivacy Policy

awma-footer-logo