AWMA

AWMA Water Control Solutions - Design, Manufacture, Install

+ 61 3 5456 3331
  • Home
  • About AWMA
    • The AWMA Team
    • Awards & Accolades
    • Services
      • Design Services
      • Manufacturing Capabilities
      • Install
      • FlowLab Testing Facility
    • Careers
    • Testimonials
  • Applications
    • Flood Mitigation
    • Environmental
    • Irrigation Modernisation
    • Urban Water
    • Dams
    • Energy & Resources
    • Fish Protection Screens
    • Industrial Intake Screens
  • Products
    • Penstocks & Gates
      • TLF Penstocks
      • SLF Penstocks
      • ULF Penstocks
      • DLF Penstocks
      • Decant Gates
      • WLF Penstocks
      • LayFlat Gates
      • Sidewinders
      • Multi-leaf Gates
      • Bulkheads
      • Round Bottom Bulkheads
      • Modular Stoplogs
      • Stopboards
      • Radial Gates
      • Flap Gates
      • Specialised Gates
    • Actuation Systems
    • Flood Gates and Barriers
      • Flood Gates
      • TILTING BARRIERS
      • RETRACTABLE BARRIERS
      • CONCEALED BARRIER
      • Demountable Barriers
      • SWING BARRIER
      • FLOOD DOORS
    • Screens – Self Cleaning
      • CYLINDER SCREENS – POWERED
      • Cylinder Screens – Self-Propelled
      • Travelling Polymer Screens
      • Cone Screens
      • Flat Panel Screens
      • Trash Screens & Trash Racks
    • Fish Protection Screens
    • Worthington Booms
  • Projects
    • All
    • Flood Mitigation Projects
    • Environmental Projects
    • Irrigation Projects
    • Urban Water Projects
    • Dam Projects
    • Energy and Resources Projects
    • Screen Projects
  • Gallery
    • AWMA
    • Flood
    • Environmental
    • Irrigation
    • Urban Water
    • Dams
    • Energy and Resources
    • Screens
    • Video
  • Media
    • News
    • Downloads
  • Contact
    • Australia
    • New Zealand

Melbourne Water’s Northern Sewerage Project

June 16, 2016 by

Print Friendly, PDF & Email

John Holland Tunnelling engaged AWMA to assist with the high profile Melbourne Water project The Northern Sewerage Project.

The Northern Sewerage Project (NSP) involves the construction of 12.5 km of new sewer from Reservoir to Essendon and is a $650 million investment in Melbourne’s future.

The NSP is an essential infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs and help protect local creeks by virtually eliminating sewage spills that can occur after heavy rain.

The infrastructure for this project required significant engineering. AWMA’s unique capacity to achieve innovative designs using grade 2507 stainless steel resulted in custom manufactured products that exceeded all requirements.

For more information

Client: John Holland Tunnelling
Asset Owner: Melbourne Water
Value: $650 Million

Filed Under: Urban Water

Phone: + 61 3 5456 3331

Email: info@nullawmawatercontrol.com.au

Facebook
Twitter
YouTube
LINKEDIN

Related ArticlesPrivacy Policy

AWMA Logo AWMA Quality Awards
QUALITYLOGOS

Phone: +61 3 5456 3331
Email: info@awmawatercontrol.com.au

FACEBOOK
YOUTUBE
LINKEDIN

Related ArticlesPrivacy Policy

awma-footer-logo