AWMA were engaged by Koppens Developments to supply a stainless steel top sealing penstock (TLF Penstock) to manage the Innisfail WWTP ByPass.
The penstock will provide isolation for a 450mm diameter aperture to a maximum 2m on-seating head pressure.
A non-rising spindle and manual hand wheel allow for safe operation above the wet weather outfall channel.
During the post project interview “brilliant” was the word Kevin Limpus used to describe AWMA’s products and the service he received.
The care taken to pack and deliver all goodsonto site, in excellent condition, was also commended.
AWMA supply and deliver water control equipment across the globe. Transportation is a key design consideration in the early contractor involvement stage. Equipment may be flat packed or constructed to fit securely in shipping containers and designed to be easily reassembled on site.
Complete installation, operation and maintenance manuals are provided with all AWMA products.
Pictured is an example of a modular gate assembly ready for international shipment.