The three AWMA multi-leaf combination gates required for this State Water project were 2.5m high x 1.3m wide, offering multiple flow options with high headstocks to accommodate flood conditions.
The dual spindle actuation system is operated via removable manual handwheels.
The AWMA Combination gates were retrofitted on the sheet pile structure at low water levels via boat access.
For more information
Client: State Water Corporation
Asset Owner: State Water Corporation, NSW