AWMA

AWMA Water Control Solutions - Design, Manufacture, Install

+ 61 3 5456 3331
  • Home
  • About AWMA
    • The AWMA Team
    • Awards & Accolades
    • Services
      • Design Services
      • Manufacturing Capabilities
      • Install
      • FlowLab Testing Facility
    • Careers
    • Testimonials
  • Applications
    • Flood Mitigation
    • Environmental
    • Irrigation Modernisation
    • Urban Water
    • Dams
    • Energy & Resources
    • Fish Protection Screens
    • Industrial Intake Screens
  • Products
    • Penstocks & Gates
      • TLF Penstocks
      • SLF Penstocks
      • ULF Penstocks
      • DLF Penstocks
      • Decant Gates
      • WLF Penstocks
      • LayFlat Gates
      • Sidewinders
      • Multi-leaf Gates
      • Bulkheads
      • Round Bottom Bulkheads
      • Modular Stoplogs
      • Stopboards
      • Radial Gates
      • Flap Gates
      • Specialised Gates
    • Actuation Systems
    • Flood Gates and Barriers
      • Flood Gates
      • TILTING BARRIERS
      • RETRACTABLE BARRIERS
      • CONCEALED BARRIER
      • Demountable Barriers
      • SWING BARRIER
      • FLOOD DOORS
    • Screens – Self Cleaning
      • CYLINDER SCREENS – POWERED
      • Cylinder Screens – Self-Propelled
      • Travelling Polymer Screens
      • Cone Screens
      • Flat Panel Screens
      • Trash Screens & Trash Racks
    • Fish Protection Screens
    • Worthington Booms
  • Projects
    • All
    • Flood Mitigation Projects
    • Environmental Projects
    • Irrigation Projects
    • Urban Water Projects
    • Dam Projects
    • Energy and Resources Projects
    • Screen Projects
  • Gallery
    • AWMA
    • Flood
    • Environmental
    • Irrigation
    • Urban Water
    • Dams
    • Energy and Resources
    • Screens
    • Video
  • Media
    • News
    • Downloads
  • Contact
    • Australia
    • New Zealand

Stopboards and Penstocks for Dam Upgrade

August 8, 2021 by

Print Friendly, PDF & Email

AWMA were engaged by Seymour Whyte Constructions for the Melbourne Water Upper Yarra Dam Upgrade.

The water control gates isolate flow into the seepage weir structure at the toe of the dam, for maintenance purposes.

Four large marine grade aluminium Bulkhead gates and frames were manufactured and supplied up to 2300mm aperture width, 3100mm high. The Bulkhead gates are inserted into permanently installed frames to isolate flow in the Dam seepage weir structure. The Bulkheads were designed with integral Butterfly and Ball Valves for the equalisation of head pressure following maintenance isolation.

AWMA also supplied a top sealing TLF Penstock for bypass flow isolation. The penstock was custom designed 1200mm wide x 1700mm high, to withstand 3m operating head pressure, on and off seating.

upper-yarra-dam-awma-gates-p1
upper-yarra-dam-awma-gates-p2
upper-yarra-dam-awma-gates-p3

AWMA PRODUCTS SIMILAR TO THOSE MANUFACTURED FOR THIS PROJECT INCLUDE:

singular structures that provide isolation

BULKHEADS: singular structures that provide isolation

Modular or Singular

STOPLOGS: modular segments of any size, joined to effectively isolate flows

Topsealing penstocks with full perimeter sealing

TLF PENSTOCKS: undershot regulation with a full perimeter seal

Filed Under: Dams

Phone: + 61 3 5456 3331

Email: info@nullawmawatercontrol.com.au

Facebook
Twitter
YouTube
LINKEDIN

Related ArticlesPrivacy Policy

AWMA Logo AWMA Quality Awards
QUALITYLOGOS

Phone: +61 3 5456 3331
Email: info@awmawatercontrol.com.au

FACEBOOK
YOUTUBE
LINKEDIN

Related ArticlesPrivacy Policy

awma-footer-logo