AWMA

AWMA Water Control Solutions - Design, Manufacture, Install

+ 61 3 5456 3331
  • Home
  • About AWMA
    • The AWMA Team
    • Awards & Accolades
    • Services
      • Design Services
      • Manufacturing Capabilities
      • Install
      • FlowLab Testing Facility
    • Careers
    • Testimonials
  • Applications
    • Flood Mitigation
    • Environmental
    • Irrigation Modernisation
    • Urban Water
    • Dams
    • Energy & Resources
    • Fish Protection Screens
    • Industrial Intake Screens
  • Products
    • Penstocks & Gates
      • TLF Penstocks
      • SLF Penstocks
      • ULF Penstocks
      • DLF Penstocks
      • Decant Gates
      • WLF Penstocks
      • LayFlat Gates
      • Sidewinders
      • Multi-leaf Gates
      • Bulkheads
      • Round Bottom Bulkheads
      • Modular Stoplogs
      • Stopboards
      • Radial Gates
      • Flap Gates
      • Specialised Gates
    • Actuation Systems
    • Flood Gates and Barriers
      • Flood Gates
      • TILTING BARRIERS
      • RETRACTABLE BARRIERS
      • CONCEALED BARRIER
      • Demountable Barriers
      • SWING BARRIER
      • FLOOD DOORS
    • Screens – Self Cleaning
      • CYLINDER SCREENS – POWERED
      • Cylinder Screens – Self-Propelled
      • Travelling Polymer Screens
      • Cone Screens
      • Flat Panel Screens
      • Trash Screens & Trash Racks
    • Fish Protection Screens
    • Worthington Booms
  • Projects
    • All
    • Flood Mitigation Projects
    • Environmental Projects
    • Irrigation Projects
    • Urban Water Projects
    • Dam Projects
    • Energy and Resources Projects
    • Screen Projects
  • Gallery
    • AWMA
    • Flood
    • Environmental
    • Irrigation
    • Urban Water
    • Dams
    • Energy and Resources
    • Screens
    • Video
  • Media
    • News
    • Downloads
  • Contact
    • Australia
    • New Zealand

Sydney Water’s North Head STP

June 23, 2016 by

Print Friendly, PDF & Email
AWMA successfully delivered a range of penstocks and stop gates at Sydney Water’s North Head STP, for PARR Alliance.

AWMA were responsible for the design, manufacture and installation of 28 penstocks and 20 stop gates that allow for an open waterway up to 4m high x 3m wide.

Industry first specifications required the research and development of new design options. Investigations were required both on and off site in an effort to meet the challenging design criteria.

The North Head STP is the fourth largest sewage treatment plant in Australia. Upgrade works will ensure improved plant performance and reliability.

OLYMPUS DIGITAL CAMERA
north-head-awma-penstocks
North-Head-STP-with-PARR-4
syd-wwtp-awma-penstocks-3
syd-wwtp-awma-penstocks-8
syd-wwtp-awma-penstocks-2
North-Head-STP-with-PARR-5

For more information

Client: PARR Alliance
Asset Owner: Sydney Water, NSW
Value: $150 Million

  • Sydney Water – North Head STP

Filed Under: Urban Water

Phone: + 61 3 5456 3331

Email: info@nullawmawatercontrol.com.au

Facebook
Twitter
YouTube
LINKEDIN

Related ArticlesPrivacy Policy

AWMA Logo AWMA Quality Awards
QUALITYLOGOS

Phone: +61 3 5456 3331
Email: info@awmawatercontrol.com.au

FACEBOOK
YOUTUBE
LINKEDIN

Related ArticlesPrivacy Policy

awma-footer-logo