AWMA

AWMA Water Control Solutions - Design, Manufacture, Install

+ 61 3 5456 3331
  • Home
  • About AWMA
    • The AWMA Team
    • Awards & Accolades
    • Services
      • Design Services
      • Manufacturing Capabilities
      • Install
      • FlowLab Testing Facility
    • Careers
    • Testimonials
  • Applications
    • Flood Mitigation
    • Environmental
    • Irrigation Modernisation
    • Urban Water
    • Dams
    • Energy & Resources
    • Fish Protection Screens
    • Industrial Intake Screens
  • Products
    • Penstocks & Gates
      • TLF Penstocks
      • SLF Penstocks
      • ULF Penstocks
      • DLF Penstocks
      • Decant Gates
      • WLF Penstocks
      • LayFlat Gates
      • Sidewinders
      • Multi-leaf Gates
      • Bulkheads
      • Round Bottom Bulkheads
      • Modular Stoplogs
      • Stopboards
      • Radial Gates
      • Flap Gates
      • Specialised Gates
    • Actuation Systems
    • Flood Gates and Barriers
      • Flood Gates
      • TILTING BARRIERS
      • RETRACTABLE BARRIERS
      • CONCEALED BARRIER
      • Demountable Barriers
      • SWING BARRIER
      • FLOOD DOORS
    • Screens – Self Cleaning
      • CYLINDER SCREENS – POWERED
      • Cylinder Screens – Self-Propelled
      • Travelling Polymer Screens
      • Cone Screens
      • Flat Panel Screens
      • Trash Screens & Trash Racks
    • Fish Protection Screens
    • Worthington Booms
  • Projects
    • All
    • Flood Mitigation Projects
    • Environmental Projects
    • Irrigation Projects
    • Urban Water Projects
    • Dam Projects
    • Energy and Resources Projects
    • Screen Projects
  • Gallery
    • AWMA
    • Flood
    • Environmental
    • Irrigation
    • Urban Water
    • Dams
    • Energy and Resources
    • Screens
    • Video
  • Media
    • News
    • Downloads
  • Contact
    • Australia
    • New Zealand

Yallakool Creek Weir Refurbishment & Fishway

June 23, 2016 by

Print Friendly, PDF & Email

Civil Team Engineering engaged AWMA to design, manufacture and install water control structures for State Water’s Yallakool Creek Weir and Fishway.

The weir will be upgraded with five AWMA LayFlat Gates, allowing almost 2.5m of clear water between each pylon. An AWMA ULF undershot penstock will control the new fishway exit.

The weir refurbishment works and new fishway are valued at $3.5 million and include solar powered automation for operation via the State Water SCADA system.

Civil Team Engineering Project Manager Steve Briggs said “I’m happy to say that the AWMA staff were very helpful, cooperative and professional on the project, which because of the flooding was quite a challenge for our company. It made my job much easier being able to rely on the timely and efficiently executed work, both from a workmanship and administrative point of view.”

For more information

Client: Civil Team Engineering
Asset Owner: State Water Corporation
Value: $3.5 Million

Filed Under: Environmental

Phone: + 61 3 5456 3331

Email: info@nullawmawatercontrol.com.au

Facebook
Twitter
YouTube
LINKEDIN

Related ArticlesPrivacy Policy

AWMA Logo AWMA Quality Awards
QUALITYLOGOS

Phone: +61 3 5456 3331
Email: info@awmawatercontrol.com.au

FACEBOOK
YOUTUBE
LINKEDIN

Related ArticlesPrivacy Policy

awma-footer-logo