AWMA

AWMA Water Control Solutions - Design, Manufacture, Install

+ 61 3 5456 3331
  • Home
  • About AWMA
    • The AWMA Team
    • Awards & Accolades
    • Services
      • Design Services
      • Manufacturing Capabilities
      • Install
      • FlowLab Testing Facility
    • Careers
    • Testimonials
  • Applications
    • Flood Mitigation
    • Environmental
    • Irrigation Modernisation
    • Urban Water
    • Dams
    • Energy & Resources
    • Fish Protection Screens
    • Industrial Intake Screens
  • Products
    • Penstocks & Gates
      • TLF Penstocks
      • SLF Penstocks
      • ULF Penstocks
      • DLF Penstocks
      • Decant Gates
      • WLF Penstocks
      • LayFlat Gates
      • Sidewinders
      • Multi-leaf Gates
      • Bulkheads
      • Round Bottom Bulkheads
      • Modular Stoplogs
      • Stopboards
      • Radial Gates
      • Flap Gates
      • Specialised Gates
    • Actuation Systems
    • Flood Gates and Barriers
      • Flood Gates
      • TILTING BARRIERS
      • RETRACTABLE BARRIERS
      • CONCEALED BARRIER
      • Demountable Barriers
      • SWING BARRIER
      • FLOOD DOORS
    • Screens – Self Cleaning
      • CYLINDER SCREENS – POWERED
      • Cylinder Screens – Self-Propelled
      • Travelling Polymer Screens
      • Cone Screens
      • Flat Panel Screens
      • Trash Screens & Trash Racks
    • Fish Protection Screens
    • Worthington Booms
  • Projects
    • All
    • Flood Mitigation Projects
    • Environmental Projects
    • Irrigation Projects
    • Urban Water Projects
    • Dam Projects
    • Energy and Resources Projects
    • Screen Projects
  • Gallery
    • AWMA
    • Flood
    • Environmental
    • Irrigation
    • Urban Water
    • Dams
    • Energy and Resources
    • Screens
    • Video
  • Media
    • News
    • Downloads
  • Contact
    • Australia
    • New Zealand

Dam Projects

Print Friendly, PDF & Email
  • All
  • Flood
  • Environmental
  • Irrigation
  • Urban Water
  • Dams
  • Energy & Resources
  • Screens

Boera Dam Upgrade

Specialised AWMA Control Gates for Rookwood Weir QLD

Stop boards and Penstocks for Dam Upgrade

Isolation Bulkhead and Lifting Frame for VIC Reservoir

Penstocks And Screens for Mine Water Release Dam

MUNDARING WEIR INTAKE TOWER PENSTOCKS

Bulkhead Gates, Frames, Guides and Lifting Devices for the Mundaring Weir Outlet Upgrade

Berembed Weir Offtake and Trash Racks

Kalamia Flood Drainage Infrastructure Project

Kalamia Dam Flood Drainage Infrastructure Project

Colac Basin Inlet Screens

Colac Basin Inlet Screens

Tallowa Dam Flow Control Structures and Fishlift include 8m Overshot

Tallowa Dam Flow Control Structures and Fishlift include 8m Overshot

Bendeela Pipeline Control Structure for Pumping and Power Scheme

Bendeela Pipeline Control Structure for Pumping and Power Scheme

Phone: + 61 3 5456 3331

Email: info@nullawmawatercontrol.com.au

Facebook
Twitter
YouTube
LINKEDIN

Related ArticlesPrivacy Policy

AWMA Logo AWMA Quality Awards
QUALITYLOGOS

Phone: +61 3 5456 3331
Email: info@awmawatercontrol.com.au

FACEBOOK
YOUTUBE
LINKEDIN

Related ArticlesPrivacy Policy

awma-footer-logo