AWMA

AWMA Water Control Solutions - Design, Manufacture, Install

+ 61 3 5456 3331
  • Home
  • About AWMA
    • The AWMA Team
    • Awards & Accolades
    • Services
      • Design Services
      • Manufacturing Capabilities
      • Install
      • FlowLab Testing Facility
    • Careers
    • Testimonials
  • Applications
    • Flood Mitigation
    • Environmental
    • Irrigation Modernisation
    • Urban Water
    • Dams
    • Energy & Resources
    • Fish Protection Screens
    • Industrial Intake Screens
  • Products
    • Penstocks & Gates
      • TLF Penstocks
      • SLF Penstocks
      • ULF Penstocks
      • DLF Penstocks
      • Decant Gates
      • WLF Penstocks
      • LayFlat Gates
      • Sidewinders
      • Combination Gates
      • Multi-leaf Gates
      • Bulkheads
      • Round Bottom Bulkheads
      • Modular Stoplogs
      • Stopboards
      • Radial Gates
      • Flap Gates
      • Specialised Gates
    • Actuation Systems
    • Flood Gates and Barriers
      • Flood Gates
      • TILTING BARRIERS
      • RETRACTABLE BARRIERS
      • CONCEALED BARRIER
      • Demountable Barriers
      • SWING BARRIER
      • FLOOD DOORS
    • Screens – Self Cleaning
      • CYLINDER SCREENS – POWERED
      • Cylinder Screens – Self-Propelled
      • Travelling Polymer Screens
      • Cone Screens
      • Flat Panel Screens
      • Trash Screens & Trash Racks
    • Fish Protection Screens
  • Projects
    • All
    • Flood Mitigation Projects
    • Environmental Projects
    • Irrigation Projects
    • Urban Water Projects
    • Dam Projects
    • Energy and Resources Projects
    • Screen Projects
  • Gallery
    • AWMA
    • Flood
    • Environmental
    • Irrigation
    • Urban Water
    • Dams
    • Energy and Resources
    • Screens
    • Video
  • Media
    • News
    • Downloads
  • Contact
    • Australia
    • New Zealand

Projects

Print Friendly, PDF & Email
  • All
  • Flood
  • Environmental
  • Irrigation
  • Urban Water
  • Dams
  • Energy & Resources
  • Screens

Water Control Gates for Sydney Water Treatment Facilities

Filter Inlet Penstocks with Drip Tight Seal for QLD WTP

Purpose-built Isolation Bulkhead

Purpose-built Isolation Bulkhead for Amaroo Main Sewer Project

Lower Molonglo Water Quality Control Centre Penstocks Provide Improved Plant Performace

Round Bottom Penstock For The Melbourne Main Sewer Replacement Project

Round Bottom Penstock For The Melbourne Main Sewer Replacement Project

Stainless Steel Penstocks for WWTP Bypass

Stainless Steel Penstocks for WWTP Bypass

Engineered Penstocks for High Profile Melbourne Water Tunnelling Project

Engineered Penstocks for High Profile Melbourne Water Tunnelling Project

Southern Seawater Desalination Plant

Penstocks and Modular Stopboards Isolate Seawater at Southern Seawater Desalination Plant

AWMA decant gate for Yamba WWTP

Decant Penstock With Specialised Decanting Mechanism Sustains High Frequency Duty Cycles

Melbourne Water’s Wet Weather Capacity Upgrade at the Western Treatment Plant

Melbourne Water’s Wet Weather Capacity Upgrade at the Western Treatment Plant

Stopboards for Water Corporation’s Mundaring Water Treatment Plant

Stopboards for Water Corporation’s Mundaring Water Treatment Plant

Victorian Desalination Plant

Victorian Desalination Plant

Sydney Water’s North Head STP

Sydney Water’s North Head STP

Phone: + 61 3 5456 3331

Email: info@awmawatercontrol.com.au

Facebook
Twitter
YouTube
LINKEDIN

Related ArticlesPrivacy Policy

AWMA Logo AWMA Quality Awards
QUALITYLOGOS

Phone: +61 3 5456 3331
Email: info@awmawatercontrol.com.au

FACEBOOK
YOUTUBE
LINKEDIN

Related ArticlesPrivacy Policy

Awmawatercontrol